ABS PH2 — Advanced Building Systems

Advanced Building Systems · Patented Interlocking Block System

Build Faster.
Build Stronger.
Build Smarter.

A patented, laboratory-tested interlocking block system, engineered Waffle Pod foundations, and rapid Speed Slab formwork — built for a world that can no longer accept substandard buildings, rising labour costs, or slow construction timelines.

Builders & DevelopersProspective FranchiseesArchitects & EngineersGovernments & NGOsDisaster-Resilient HousingTurnkey ManufacturingBuilders & DevelopersProspective FranchiseesArchitects & EngineersGovernments & NGOsDisaster-Resilient HousingTurnkey Manufacturing
By the numbers

Performance that shows up on the schedule and the budget.

4-500

ABS blocks laid per worker, per day

vs. 90–100 for a conventional block

0–60%

Construction time saved

with the full 3-part ABS system

4 floors

Structures achievable

with Waffle Pod raft slab foundations

4,000–6,000/day

Blocks producible per plant

typical output, scalable by plant size

Resilient construction in progress
Why the industry is changing

Substandard buildings cost lives. Rising labour costs cost projects.

The construction industry is constantly re-inventing itself to keep up with demand for better quality, safer and stronger buildings with better insulation — a genuine green solution — coupled with faster construction and reduced costs. Recent disasters around the world have shown what happens when substandard buildings meet earthquakes, floods, and cyclones. Ever-increasing labour costs and demands mean the old norm is no longer acceptable.

ABS resolves both problems at once: a laboratory-tested, disaster-resilient block system that semi-skilled crews can install far faster than conventional masonry.

See why builders are switching to ABS
A 3-part solution

Waffle Pods. ABS Blocks. Speed Slab.

For maximum time and cost saving, use all three together — though each system delivers real gains on its own.

01

Waffle Pod raft slab

Ground is levelled, services laid, and polystyrene Waffle Pods placed across the slab area — no deep footings required, even on unstable soils.

02

ABS Blocks, dry-stacked

Patented interlocking blocks are laid Lego-style with no mortar joints — semi-skilled crews lay 4–500 blocks a day versus 90–100 conventionally.

03

Speed Slab suspended floors

Lightweight in-situ formwork panels span upper floors in a fraction of the time of timber/ply formwork — and stay in place for acoustic and thermal insulation.

04

Render & finish

Straighter, truer ABS walls need minimal plaster — a spray-on render is typically sufficient, saving material and labour on finishing.

What partners say

Trusted by builders, franchisees, and programme engineers.

Read all testimonials

“We cut our shell-and-core timeline by more than half. The dry-stack system meant our crews were productive from week one — no waiting on skilled block-layers we simply couldn't find.”

RC

Regional Contractor

Builder & Developer, South-East Asia

“The franchise process was genuinely turnkey. ABS specified the plant, trained our team on-site, and stayed involved well past commissioning. We were producing saleable blocks inside the first quarter.”

PF

Plant Franchisee

ABS Manufacturing Partner

Ready to build faster, stronger, smarter?

Talk to the ABS PH2 team about your project, your franchise territory, or your technical questions.